Paving Main Street:
In 1930 Auburn City Council paved Main Street.
Taxes were levied on all the households abounding
the street.
The charges varied depending on the foot frontage. According to Ms.
Christine Rowe Hollins "in 1928, Main Street
was in such bad shape (it was gravel)
that improvements were necessary from W. City limits to the bridge at E. City
limits, by
putting in curbs, guttering and paving. The State Highway Department is to help because
they consider our
Main Street a necessary link in The Dixie Highway. The bid for curbs and
guttering was let to C. B. Peart at a cost of
$9532 and work was done in 1930. The bid for
surfacing was let in June 1930 to Campbell and Company of Bowling
Green at a cost of
$19,989.37 and finished in December 1930."
| Residents and Businesses on Main
Street, Auburn as of December 5, 1930 |
|
|
|
|
The following is a list of those being
levied with and improvement tax as a result of the improvements&of asphalting Main Street. |
|
|
|
|
Note: C
& G = Curb & Guttering
V. G. = Valley guttering |
|
|
|
|
| N. H. Robinson |
|
Mrs.
W. A. Orr |
|
|
W.
H. Pugh |
|
| 70.7 |
ft. C & G. |
$70.70 |
|
128.7 |
ft. C & G. |
$128.70 |
|
|
32.0 |
ft. V. G. |
$47.39 |
|
|
x 2.8 ft. Driveway |
|
|
13.2 |
x 2.8 ft. Driveway |
$10.95 |
|
|
0.0 |
ft. C & G. |
$0.00 |
2.2 |
| 70.7 |
ft. Asphalt |
$169.50 |
|
141.9 |
ft. Asphalt |
$340.19 |
|
|
32.0 |
ft. Asphalt |
$76.72 |
|
|
Total |
$240.20 |
|
|
Total |
$479.84 |
|
|
|
Total |
$124.11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| P. T. Neal |
|
Mrs.
Curry Hall |
|
|
W.
N. Brake |
|
| 146 |
ft. C & G. |
$146.00 |
|
153.5 |
ft. C & G. |
$153.50 |
|
|
61.0 |
ft. V. G. |
$90.34 |
|
| 12 |
x 2.8 ft. Driveway |
$10.31 |
|
13.5 |
x 2.8 ft. Driveway |
$12.00 |
3 |
|
0.0 |
ft. C & G. |
$0.00 |
2.2 |
| 158 |
ft. Asphalt |
$378.79 |
|
167.0 |
ft. Asphalt |
$400.37 |
|
|
61.0 |
ft. Asphalt |
$146.24 |
|
|
Total |
$524.79 |
|
|
Total |
$565.86 |
|
|
|
Total |
$236.58 |
|
|
|
|
|
|
|
|
|
|
|
|
| Young Moody |
|
Will
Ragland |
|
|
Scott
Proctor |
|
| 164.5 |
ft. C & G. |
$164.50 |
|
44.2 |
ft. C & G. |
$44.20 |
|
|
73.0 |
ft. V. G. |
$108.11 |
|
|
x 2.8 ft. Driveway |
|
|
0.0 |
x 2.8 ft. Driveway |
$0.00 |
|
|
0.0 |
ft. C & G. |
$0.00 |
2.2 |
| 164.5 |
ft. Asphalt |
$394.37 |
|
44.2 |
ft. Asphalt |
$105.97 |
|
|
73.0 |
ft. Asphalt |
$175.01 |
|
|
Total |
$558.87 |
|
|
Total |
$150.17 |
|
|
|
Total |
$283.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Ray Scott |
|
Mrs.
Aaron McCarley |
|
|
M.
J. Gill |
|
| 70.0 |
ft. C & G. |
$70.00 |
|
311.0 |
ft. C & G. |
$311.00 |
|
|
40.0 |
ft. V. G. |
$59.24 |
|
| 12.5 |
x 2.8 ft. Driveway |
$10.36 |
|
14.0 |
x 2.8 ft. Driveway |
$11.61 |
2.8 |
|
0.0 |
ft. C & G. |
$0.00 |
2.2 |
| 82.5 |
ft. Asphalt |
$197.79 |
|
325.0 |
ft. Asphalt |
$779.16 |
|
|
40.0 |
ft. Asphalt |
$95.90 |
|
|
Total |
$278.15 |
|
|
Total |
$1,101.77 |
|
|
|
Total |
$155.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Dave Scott |
|
Cumb.
Presbyterian Church |
|
|
Kingston
Heirs |
|
| 69.5 |
ft. C & G. |
$69.50 |
|
145.2 |
ft. C & G. |
$145.20 |
|
|
53.0 |
ft. V. G. |
$78.49 |
|
| 13.0 |
x 2.8 ft. Driveway |
$10.78 |
|
0.0 |
x 2.8 ft. Driveway |
$0.00 |
2.8 |
|
0.0 |
ft. C & G. |
$0.00 |
2.2 |
| 82.5 |
ft. Asphalt |
$197.79 |
|
145.2 |
ft. Asphalt |
$348.10 |
|
|
53.0 |
ft. Asphalt |
$127.06 |
|
|
Total |
$278.07 |
|
|
Total |
$493.30 |
|
|
|
Total |
$205.56 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| John Webb |
|
Mrs.
Will Stagner |
|
|
T.
J. Gill |
|
| 84.5 |
ft. C & G. |
$84.50 |
|
106.3 |
ft. C & G. |
$106.30 |
|
|
30.0 |
ft. V. G. |
$44.43 |
|
| 12.5 |
x 2.8 ft. Driveway |
$10.37 |
|
10.0 |
x 2.8 ft. Driveway |
$6.52 |
2.2 |
|
0.0 |
ft. C & G. |
$0.00 |
2.2 |
| 97.0 |
ft. Asphalt |
$232.55 |
|
116.3 |
ft. Asphalt |
$278.82 |
|
|
30.0 |
ft. Asphalt |
$71.92 |
|
|
Total |
$327.41 |
|
|
Total |
$391.63 |
|
|
|
Total |
$116.35 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Ed Johnson |
|
M.
A. Neal |
|
|
H. B.
McClary |
|
| 112.5 |
ft. C & G. |
$112.50 |
|
104.7 |
ft. C & G. |
$104.70 |
|
|
90.83 |
ft. V. G. |
$134.52 |
|
| 6.5 |
x 2.8 ft. Driveway |
$5.39 |
|
0.0 |
x 2.8 ft. Driveway |
$0.00 |
2.2 |
|
0.00 |
ft. C & G. |
$0.00 |
2.2 |
| 119.0 |
ft. Asphalt |
$285.29 |
|
104.7 |
ft. Asphalt |
$251.01 |
|
|
90.83 |
ft. Asphalt |
$217.76 |
|
|
Total |
$403.18 |
|
|
Total |
$355.71 |
|
|
|
Total |
$352.28 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| R. L. Adams |
|
P.
T. Neal |
|
|
Auburn
Banking |
|
| 112.5 |
ft. C & G. |
$112.50 |
|
54.0 |
ft. C & G. |
$54.00 |
|
|
41.6 |
ft. V. G. |
$61.61 |
|
| 6.5 |
x 2.8 ft. Driveway |
$5.39 |
|
0.0 |
x 2.8 ft. Driveway |
$0.00 |
2.2 |
|
0.0 |
ft. C & G. |
$0.00 |
2.2 |
| 119.0 |
ft. Asphalt |
$285.29 |
|
54.0 |
ft. Asphalt |
$129.46 |
|
|
41.6 |
ft. Asphalt |
$99.73 |
|
|
Total |
$403.18 |
|
|
Total |
$183.46 |
|
|
|
Total |
$161.34 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| R. H. Holland |
|
Mrs.
Lillie Brand |
|
|
O.M.
Crewdson |
|
| 65.0 |
ft. C & G. |
$65.00 |
|
83.0 |
ft. C & G. |
$83.00 |
|
|
164.6 |
ft. V. G. |
$243.77 |
|
| 21.0 |
x 2.8 ft. Driveway |
$17.42 |
|
0.0 |
| |